|
Equipment PM |
 |
|
|
|
|
|
|
|
|
|
Equipment PM
|
|
Installed Equipment
|
-
This form is used to install (add) equipment to a
building.
-
To speed up the data entry process, the piece of equipment
is actually copied from a Template
including any PM Tasks or
Cards associated with that
equipment.
-
Once the equipment is installed, it's a simple matter of
entering the equipment a number, building and serial number.
|
|
 |
|
|
|
Equipment PM
Features
Main Menu
Tabs
Schedule of Tasks
Card File
Miscellaneous |
|
|
|
|
|
|