|
Equipment PM |
 |
|
|
|
|
|
|
|
|
Equipment PM
|
|
Installed Equipment
|
-
This tab of the Installed Equipment form allows you to add
PM Tasks for the selected piece of equipment.
-
To aid the data entry process, PM Tasks are entered into
the Template then copied
with the equipment information.
|
|
 |
|
Equipment PM
Features
Main Menu
Tabs
General
Card File
Miscellaneous
|
|
|
|
|
|